Sports

Biwase Tour of Vietnam 2026 will arrive in Lam Dong on March 6th

Viet Trong

According to the official schedule of the Biwase Tour of Vietnam 2026, the peloton is set to enter Lam Dong on March 6th, finishing the stage in Bao Loc. Following this, the race will continue with four additional stages, all of which will conclude within the province.

d5.jpg
Female riders competed on the stage from Bao Loc to Da Lat in 2025.

Maintaining last year’s 'two-in-one' format, the event integrates the Biwase Tour of Vietnam 2026 with the Ho Chi Minh City International Women’s Cycling Tournament – Biwase Cup 2026.

The competitions run from March 4th to 14th, 2026, featuring 10 stages and a circuit race around Xuan Huong Lake, with total distance spanning over 1,300 km. The Biwase Tour includes five stages, starting in Ho Chi Minh City, passing through Dong Nai, and finishing in Da Lat.

On March 9th, the Biwase Tour concludes in Da Lat, followed immediately by the start of the Biwase Cup with five additional stages. The 50-km (10-lap) race around Xuan Huong Lake serves as the opening stage of the Cup.

After that, the teams descend Khanh Vinh Pass to Khanh Hoa for the first two stages, then continue to Phan Thiet – Lam Dong (Stage 3), Vung Tau (Stage 4), and finish in Thu Dau Mot – Ho Chi Minh City (Stage 5), officially concluding the tournament

a12-2-.jpg
The leading rider crossed the finish line in the stage from Bao Loc to Da Lat in 2025.

Notably, both events are officially included in the international competition calendar of the Union Cycliste Internationale(UCI), with ranking points awarded. This milestone marks the tournament’s growing professionalism and international recognition after 16 years of organization.

A total of 22 teams are competing, including seven Vietnamese teams and 15 international teams from countries such as Thailand, Malaysia, Indonesia, Singapore, Kazakhstan, Uzbekistan, Norway, Ecuador, the Philippines, South Korea, China, Australia, Switzerland, Spain, and Taiwan (China).

dsc_0025.jpg
The organizing committee presented awards to the top international riders in a stage of the 2025 race.

Lam Dong, including Da Lat, has long been a key and much-anticipated destination of the race, with five stages finishing in the province this year.

  • March 6th (Stage 3, 119.7 km): From Dau Giay via National Highway 20, riders conquer Chuoi Pass and Bao Loc Pass before finishing in Bao Loc.
  • March 7th (Stage 4, 110.5 km): From Bao Loc to Da Lat, crossing Prenn Pass before the finish at Yersin Park near Lam Vien Square.
  • March 8th (Stage 5, 75 km): From the Lien Khuong–Duc Trong expressway area through Duc Trong and Nam Ban, over Ta Nung Pass, back to Da Lat, concluding the Biwase Tour of Vietnam 2026.
On March 9th, the closing and awards ceremony takes place at Yersin Park, followed by a 50 km (10 laps) race around Xuan Huong Lake to open the Ho Chi Minh City International Women’s Cycling Tournament – Biwase Cup 2026.
a11-1-.jpg
The start of the 10-lap race around Xuan Huong Lake in 2025.

On March 10th and 11th, the Biwase Cup 2026 continues with its first two stages in Khanh Hoa. Stage 1 (118 km) runs from Khanh Vinh to Ninh Hoa and into Nha Trang, crossing Ru Ri, Ro Tuong, and Luong Son passes. Stage 2 (125 km) starts in Nha Trang, follows the coastal road over Cu Hin and Vinh Hy passes, and finishes in Dong Hai (formerly Phan Rang).

a12-2-.jpg
The first riders crossed the finish line in the circuit race around Xuan Huong Lake – Da Lat in 2025.

On March 12th, Stage 3 covers 164 km from Phan Rang to Phan Thiet, finishing on Tran Hung Dao Street; the award ceremony takes place at 28 Nguyen Tat Thanh.

On March 13th, Stage 4 goes from Phan Thiet to Vung Tau. On March 14th, the fifth and final stage finishes in Thu Dau Mot (Ho Chi Minh City), officially concluding the tournament.

Highlight

    Latest news
    Biwase Tour of Vietnam 2026 will arrive in Lam Dong on March 6th
    • Default
    POWERED BY ONECMS - A PRODUCT OF NEKO