News

Lam Dong Chairman Ho Van Muoi inspects the southeast coastal road project

Nguyen Luong 09/04/2026 23:49

Lam Dong Provincial People’s Committee Chairman Ho Van Muoi has urged relevant departments and investors to appoint qualified contractors to keep the coastal road project on schedule.

tri06666-1-(1).jpg
Deputy Secretary of the Provincial Party Committee and Chairman of the Lam Dong Provincial People’s Committee Ho Van Muoi, inspects the Hoang Hon coastal slope area in Phan Thiet.

On April 9, Ho Van Muoi, member of the Party Central Committee, Deputy Secretary of the Provincial Party Committee and Chairman of the provincial People’s Committee led an on-site inspection of proposed locations for the southeastern Lam Dong coastal road project. The delegation comprised representatives from relevant departments and agencies.

img_0142-1-.jpeg
The Southeastern Lam Dong coastal road project spans 14.6 km with a total investment of over VND 9.4 trillion

The project extends 14.6 km through three wards—Phu Thuy, Phan Thiet, and Tien Thanh—and features a six-lane carriageway for motor vehicles.

img_0154-1-.jpeg
Chairman of the Provincial People’s Committee Ho Van Muoi received a preliminary briefing from relevant departments on the coastal road project.

The route will run from the DT706B roundabout in Phu Thuy Ward to DT719 at Cambodia Slope in Tien Thanh Ward. The total estimated investment is about VND 9.49 trillion.

Project Management Unit No. 2 has completed the selection of consultants and is preparing the pre-feasibility study report. The consultant is currently completing the required procedures.

img_0144(1).jpeg
Phan Thiet coastal tourism area is being developed with synchronised infrastructure.

During the inspection, Chairman of the provincial People’s Committee Ho Van Muoi emphasized that the long-anticipated project is vital to ensuring seamless connectivity along the province’s coastal network.

img_0155(1).jpeg
Chairman of the Provincial People’s Committee Ho Van Muoi reviews the situation at Phu Hai Port.

Once completed, the project will significantly bolster the local transportation network, particularly coastal infrastructure, and serve as a catalyst for socio-economic growth across the region.

img_0152(1).jpeg
Provincial People’s Committee Chairman Ho Van Muoi reviews progress and inspects sites for the coastal road project.

To ensure effective, on-schedule implementation, investors must select contractors with strong financial standing and proven construction expertise. Local authorities should strengthen land management, improve environmental sanitation, and preserve a green, clean, and attractive landscape.

Chairman of the Lam Dong Provincial People’s Committee Ho Van Muoi

Read more

Highlight

    Latest news
    Lam Dong Chairman Ho Van Muoi inspects the southeast coastal road project
    • Default
    POWERED BY ONECMS - A PRODUCT OF NEKO